PROJECTS
SELECTED MAJOR PROJECTS
PROJECTS
Two decades of delivery across Mozambique and Malawi — from greenfield bush clearing to dam construction, GPS-controlled land forming and large-scale road programmes. CLM provides a practical understanding of what agricultural development really costs and what is required to implement it successfully.
COUNTRY
MOZAMBIQUE
MALAWI
SECTOR
SUGAR
CITRUS
LUCERNE
AQUACULTURE
MINING
ROADS
TYPE
LAND LEVELLING
BUSH CLEARING
LAND PREPARATION
EARTH WORKS
DAM CONSTRUCTION
ROAD WORKS
Mozambique | SUGAR | LAND LEVELLING
Land Levelling, Field Preparation & Services — Marromeu
GPS levelling of 2,000 ha. Plough-out and field preparation of existing fields averaging 2,000 ha/year. New organic sugar fields development, road and canal construction and maintenance, and seed cane haulage.
Duration: Aug 2013 – Ongoing $12M
Mozambique | Citrus | Bush Clearing
Bush Clearing & Land Preparation — Massingir
Bush clearing and land preparation for 500 ha of new citrus orchards. Heavy ploughing and ripping using high-horsepower Case tractors and Rome implements.
Duration: Jul 2021 – Ongoing $0.2M
Mozambique | Lucerne | Land Preparation
Land Preparation — Massingir Valley Farms
Land preparation on a planned 20,000 ha Lucerne estate — initial trial area. Heavy ploughing and ripping with high-horsepower Case tractors and Rome implements on the first 1,400 ha trial area.
Duration: Sep 2022 – Apr 2023 $0.1M
Mozambique | Sugar | Land Preparation
Land Preparation — Xinavane
Land preparation and laser levelling of new project areas and existing estate fields over an 11-year programme.
Duration: Aug 2007 – Feb 2018 $12M
Mozambique | Sugar | Land Levelling
GPS Levelling — Marromeu
Existing sugar cane estate. GPS levelling of 600 ha of sugar cane fields to client field-design specifications.
Duration: Jul 2010 – Nov 2010 $0.6M
Mozambique | Sugar | Bush Clearing
Land Preparation & Bush Clearing — Lamego South
Complete removal of bush across 2,100 ha and land preparation for sugar planting.
Duration: Jul 2006 – Jul 2007 $7M
Mozambique | Sugar | Dam Construction
Construction of Muda Dam — Sofala
Construction of the Muda Dam for irrigation supply to the Mafambisse sugar estate. Dam-wall construction with associated earthworks, controlled fill placement and compaction.
Duration: Jun 2006 – Dec 2006 $5M
Mozambique | Sugar | Dam Construction
Coal Sampling Earthworks — Moatize
Earthworks for coal sample extraction between 14–20 m depth, 40,000–70,000 BCM per sample on a greenfield site. Full environmental and safety manual implementation.
Duration: Apr 2005 – Oct 2005 $4M
Mozambique | Aquaculture| Pond Construction
300 ha Prawn Farm Construction — Quelimane
300 ha of ponds and supply canals for hatching and growing shrimp, built in expansive clay soils within a mangrove swamp area.
Duration: Mar 2003 – Dec 2004 $5.5M
KEY OBJECTIVES
HOW WE CONSULT, EVERY PROJECT.
Working around the special needs of our clients and offering flexible, innovative solutions.
Keeping abreast of new technologies and incorporating them into our offering.
Developing the skills and performance of all our employees.
Meeting client expectations in quality, timely completion and effective cost management.
Ensuring the safety and health of workers, communities and the environment.
CLM’S ROLE
Six ways we plug into your project.
CLM Agri Consultancy can support clients in several practical roles, depending on project requirements
ADVISOR
Providing practical agricultural development advice based on real field, mechanisation and contracting experience.
MECHANISATION SPECIALIST
Advising on equipment selection, fleet configuration, implement matching, maintenance planning, workshop requirements and realistic equipment operating costs.
PLANNER
Assisting with development planning, equipment planning, implementation sequencing, operational structures and project readiness.
PROJECT MANAGER
Assisting clients with project coordination, field execution planning, production monitoring, reporting, implementation control and problem solving.
IMPLEMENTOR
Supporting the practical execution of agricultural development projects, either through direct field involvement, operational management or implementation oversight.
OPERATIONAL SPECIALIST
Providing practical support around daily field operations, equipment utilisation, workshop systems, logistics, fleet performance and operational efficiency.
KEY DIFFERENTIATOR
The key differentiator is that CLM Agri Consultancy is not a desk-based consultancy.
The consultancy is supported by the real-world contracting, mechanisation, equipment maintenance and field implementation experience of CLM Mozambique Lda, together with the procurement and supply chain capability of CLM Distribution SA.
Most consultants estimate from the outside. CLM has operated tractors, managed fleets, rebuilt equipment, run workshops, dealt with logistics, sourced spares and delivered work in remote African field conditions. This gives CLM a practical understanding of what agricultural development really costs and what is required to implement it successfully.
